Recently, the world’s first 1000-kilovolt, 1000-megavolt-ampere dual-column structure and single-column 500-mV high-voltage autotransformer were independently designed and independently manufactured by China West Power Group Corporation in Xidian Group Changzhou Xidian Transformer Co., Ltd. The responsible company broke the world record of the maximum capacity of 334 megavolt-amperes for a single column of UHV transformers through all routine tests and type tests, indicating that China’s UHV AC project construction has achieved new major technological innovation and equipment manufacturing autonomy. The innovation results have been consolidated and developed.

This 1000-kV, 1000-mV ANT high-voltage transformer was designed and manufactured by Xi'an Xideng Transformer Co., Ltd. and manufactured by Changzhou Xidian Transformer Co., Ltd., representing the highest level of design and manufacture of UHV transformers in the world today. .

It is understood that the test results show that the 1000 kV and 1000 MV volt transformers have reached the world's leading level in terms of insulation resistance, partial discharge, temperature rise, and noise, and are of the same capacity as the three-column UHV transformers. With new progress, we have achieved the goal of upgrading domestic power transmission and transformation manufacturing technology to the international advanced level through UHV construction.

Cable Entry Frame

The SVLEC cable entry system contains KDL KEL KDP series.The traditionary method is to open holes in the cabinet body, and fix and lock the cables through the Cable Glands. According to the number of cables and the external Choose the number and size of the cabinet openings according to the diameter. Once the cabinet openings are opened, the number of openings should be increased in the future. It`s very difficult to measure, and at the same time, we found that for cabinets with a large number of openings, in order to meet the installation For space requirements, the cabinet needs to be made very Large.

By SVLEC cable entry system , can make it easier .Centralization and modularization can only cut out a small windows of block the cables , save a lot of time and have a very appearance.

Kel E

Kel 24

Cable Entry Frame,Detachable Cable Entry Frame,Flexible Frame,Stright Cable Entry Frame,brush cable entry

Kunshan SVL Electric Co.,Ltd , https://www.svlelectric.com